Standardised design approach reduces overall engineering schedule by up to 2 months
Modular design minimizes engineering, material and fabrication by up to 50%
Compact topside designs are developed modularly. There are three (3) readily available designs, respectively 50 series, 200 series and 300 series with each design being fit-for-purpose, specifically designed to be simplified in the best interest of a short engineering schedule. Platforms are built to allow for potential modifications to enable operators to cover various operating scenarios
Early Production System
weighs up to 50MT
Brownfield Development
weighs up to 200MT
Greenfield Development
weighs up to 300MT